Projects
Sampson Street
![]() |
![]() |
![]() |
Project Details |
Osel architecture successfully helped win a planning appeal to convert units back into a commercial workspace for use by Cherryduck who are a locally established media company in Wapping. The Nest has been created which is an ‘exclusive workspace hub built with creatives, marketers, designers, filmmakers, photographers, animators, producers and everything in-between in mind.’
Osel completed the measured site survey, design, planning including the appeal and construction drawings. We also worked with the interior designer and coordinated to secure Building Control approval. |
Client
|
||||
---|---|---|---|---|
Cherryduck Productions
|
||||
|
||||
Location
|
||||
London Borough of Tower Hamlets
|
Related Projects |
---|
|
||
---|---|---|
Back to Projects
|
Contact
|
Pannells Court
![]() |
![]() |
![]() |
Project Details |
Conversion, refurbishment and extension of existing buildings to provide 37 new dwellings in a prime position within Guildford town centre. Each apartment has been finished to a high standard with chic white kitchens, integrated appliances and a neutral décor throughout. The apartments ooze style and sophistication.
|
Location
|
Client
|
M&E Consultant
|
||
---|---|---|---|---|
Guildford Borough Council
|
London and Devonshire Trust Limited
|
Quotient Project Services LLP
|
||
|
||||
Structural Engineer
|
||||
Tony Gee and Partners
|
Related Projects |
---|
|
||
---|---|---|
Back to Projects
|
Contact
|
Crescent House
Crescent House
Clapham, London
![]() |
![]() |
![]() |
Project Details |
Crescent House is a gated development situated in Clapham’s treasured conservation area. Dating back to 1937, the site was originally used for the Union of Post Office Workers and still stands today as a striking example of Edwardian architecture. The development comprises 36 new self-contained 1,2 and 3 bedroom apartments, including two luxurious penthouses, as well as charming communal grounds and private parking. The works, which are located within the Clapham Common Conservation Area, involved both new construction and sensitive refurbishment of the existing office building. Osel were appointed by Galliard Homes Ltd. under a Design and Build Contract to produce the high quality, modern residential spaces
|
Client
|
Location
|
Awards
|
||
---|---|---|---|---|
Galliard Homes Ltd
|
London Borough of Lambeth
|
Green Plaque by the Clapham Society
Shortlisted for the Evening Standard Building of the Year Award |
||
Related Projects |
---|
Back to Projects
|
Contact
|
The Oaks
![]() |
![]() |
![]() |
Project Details |
Osel are currently working with Ealing on two principle schemes. These are The Oaks, Central Acton and Rosebank Way, North Acton.
The Oaks on Churchfield Road and High Street is delivering 170 residential units over new and existing retail development. Osel are working with O’Shea’s to deliver the scheme for late 2018, |
Client
|
Location
|
M&E Consultant
|
||
---|---|---|---|---|
CJ O’Shea & Co Ltd – Galliard Homes Ltd
|
London Borough of Ealing
|
Mendick Waring
|
||
|
||||
Structural Engineer
|
||||
Clark Smith Partnership
|
Related Projects |
---|
|
||
---|---|---|
Back to Projects
|
Contact
|
Littleberries Estate Phase II
![]() |
![]() |
![]() |
Project Details |
Located within the Littleberries Estate, formally the headquarters of the British Province of the Order of The Daughters of Charity and St Vincent de Paul, this existing Grade II Manor is being sympathetically converted into twelve exceptional residential units.
At the heart of the Manor lies a late C17 house, extended in the late 18th Century, and increased through the addition of a Seminary Wing and Chapel in the mid-19th Century, and the Refectory Wing in the late 19th Century. A small lodge house sits to the west of the property forming part of the entrance into the site and will contain a family dwelling. The project has involved an intricate planning process, and extensive collaboration with the Local Authority. Considerate proposals have been developed to deliver a contemporary scheme within this sensitive building. The complexities of upgrading original structures to meet with current standards has involved innovative and challenging solutions, to ensure that original features are retained and enhanced. |
Client
|
Structural Engineer
|
M&E Consultant
|
||
---|---|---|---|---|
Bellis Construction
|
CX Group
|
The KUT Partnership
|
||
|
|
|||
Location
|
|
|||
London Borough of Barnet
|
|
|
Related Projects |
---|
|
|||
---|---|---|---|
Back to Projects
|
Contact
|
LUMA Concept Hotel
![]() |
![]() |
![]() |
Project Details |
A new 86 bed apart-hotel, in the heart of Hammersmith. The new Hotel is located within a conservation area. The proposal included demolition of an existing 4 storey hotel which had accommodation at lower ground, ground, first and second floor, and the erection of a 5 storey building with accommodation in the basement, ground, first, second, third and fourth floor mansard. The building above ground sits within the existing building footprint.
The client wanted to explore the use of a modular prefabricated construction technique. The super structural elements of the Hotel were fabricated off site (in the north of England) and shipped to site where they were assembled to form the hotel structure. The Hotel Façade was clad using traditional London Yellow stock brick and render sections and bay windows to reflect the local context. Unit sizes range from 17.8sqm to 24sqm with lift access to all floors. The rooms are built to a high quality finish and detail with a design unique to this hotel. |
Client
|
Structural Engineer
|
Cost Consultant
|
||
---|---|---|---|---|
Heeton Holdings
|
Ramboll UK
|
Fulkers LLP
|
||
|
|
|||
Location
|
M&E Consultant
|
|
||
London Borough of Hammersmith and Fulham
|
Boom Collective
|
|
Related Projects |
---|
|
||
---|---|---|
Back to Projects
|
Contact
|
Robart House
Robart House
Leytonstone, London
![]() |
![]() |
![]() |
Project Details |
Extension and conversion of former office building to provide 56 residential units, with the works including the creation of new lightwells and a 2 storey roof top extension. Osel provided planning and tender production services to the developer Client.
|
Client
|
M&E Consultant
|
Location
|
||
---|---|---|---|---|
Redstone Ltd
|
Chapman BDSP
|
London Borough of Waltham Forest
|
||
Planning Consultant
|
Structural Engineer
|
Contractor
|
||
D Rose Planning LLP
|
JMS Engineers Ltd
|
Crownage
|
Related Projects |
---|
|
|
---|
Back to Projects
|
Contact
|
Rosebery House
Rosebery House
Chelmsford, Essex
![]() |
![]() |
![]() |
Project Details |
Planning was achieved by others and Osel architecture were appointed by Galliard Homes Ltd to provide architectural design services to the shell & core and fitout works. Appointment ran from RIBA stage 3 through to stage 6. Scheme consisted of the conversion of an existing office building to provide 66No. apartments.
|
Client
|
M&E Consultant
|
Location
|
||
---|---|---|---|---|
Galliard Homes Ltd
|
EDC
|
Chelmsford City Council
|
||
Structural Engineer
|
||||
Meinhardt Ltd
|
Related Projects |
---|
Back to Projects
|
Contact
|
Capital Tower
![]() |
![]() |
![]() |
Project Details |
The Client’s aim was to attend to this building with a five year plan in mind as well providing space to meet the top end market rates for office space in this area. This was achieved through the careful specification of finishes for the offices as well as high quality finishes and furniture to the reception. The refurbishment of the building also addressed the crucial need to overhaul the existing lift and upgrade the heating and cooling system of the whole building.
|
Client
|
M&E Consultant
|
Cost Consultant
|
||
---|---|---|---|---|
Bourne Capital
|
Chapman BDSP
|
Gleeds UK
|
||
|
||||
Contractor
|
Structural Engineer
|
|
||
Paragon Int
|
MMP Design Ltd
|
|
Related Projects |
---|
|
||
---|---|---|
Back to Projects
|
Contact
|
The Boltons
The Boltons
Chelsea, London
![]() |
![]() |
![]() |
Project Details |
Refurbishment and extension of Grade II Listed private house, including basements to front and side and double basement to rear. Osel architecture took over at construction stage.
|
Client
|
Location
|
|||
---|---|---|---|---|
Capital Interiors
|
Royal Borough of Kensington and Chelsea
|
|||
Related Projects |
---|
Back to Projects
|
Contact
|